Skip to contents

Create a calendar of project impacts

Usage

calendarize_impact(exposition, reference, cost)

Arguments

exposition

list, calendars of exposition for different projects.

reference

character or integer, wich exposition shall be considered as the reference.

cost

to be specified

Value

list of calendar impacts for damage, employee and inhabitants, reducing all sectors.

Details

The function compute the calendar of impacts, considered as the difference between a reference situation and a projected situation. The differences included are those for damage, number of inhabitants, number of employees.

The function takes into account how data should be stored. exposition should be a list of calendar of exposition containing the reference one. For each calendar of exposition, the structure shall be organized by sectors in a consistent way (same order). If not, errors may occurs because of bad dimension, or worth inconsistent results shall de returned.

Using calendarize_exposition to prepare calendar of exposition should avoid this problems from occurring.

Author

Frédéric Grelot, frederic.grelot.1994_cran@m4x.org